Call us: 07966 770821 | E-mail: [email protected]

Virgin Project Portfolio

The requirements for this project at Virgin were for a floor that would not need any attention for at least ten years and that it must be completely dust free. This involved Resin Floor Solutions using full preparation on the floor areas using captive shotblasting. The floor was then primed and a 2mm self-levelling floor system was installed to provide a seamless finish. The floor was then sealed with a polyurethane matt sealer.

 

 

 

 

 

 

 

 

 

Top